Office fit-outs
From 5K to 100K sq ft. VAV re-zoning, landlord BMS coordination, and Title 24 alteration compliance.
Tenant improvement mechanical
Mechanical scope for office, retail, medical, and restaurant TIs: design-assist drawings, Title 24 permits, existing-system tie-ins, and closeout before the tenant moves in. More than 600 TI projects completed across California.
Interactive 3D
Interactive models of the equipment on this scope, drawn in code from what we install every week. Drag to rotate.
SMACNA rectangular duct with a radius elbow and TDC flanges - fabricated on our CNC line and tagged to the drawing.
Mechanical scope on TI buildouts. Design-assist, permit drawings, install, and turnover. We hit your milestone date or we tell you why on day one - not week six.
Tenant improvement mechanical work is its own discipline - different from new construction. You're tying into existing rooftop units, working around an active landlord BMS, navigating Title 24 retrofit requirements, and hitting a hard turnover date because the tenant's lease is starting whether you're done or not.
We have completed mechanical scope on more than 600 TI projects across California: office tenant fit-outs (5K to 100K sq ft), retail buildouts (single shops to mall-wide refresh programs), medical and dental office TIs, restaurants taking over second-generation spaces, and light industrial conversions. Our PMs sit in your weekly OAC meetings, manage submittals through your architect of record, and coordinate the trade stack so we don't hold up your ceiling close-up.
For TI work specifically, we offer design-assist engineering - we can take a basis-of-design from your architect or a flagged shell drawing and produce stamped MEP drawings, equipment selections, and Title 24 compliance docs in under three weeks. That keeps you moving while the design team finishes interior architecture.
PM walks the space with the GC, identifies existing conditions, base-building constraints, landlord requirements.
Stamped drawings, Title 24, BMS coordination with landlord. Permit pulled.
Existing system tie-in, ductwork rough-in, equipment sets.
Diffusers, controls trim, TAB report, O&M, as-builts, training. Done before tenant move-in.

From 5K to 100K sq ft. VAV re-zoning, landlord BMS coordination, and Title 24 alteration compliance.
Outpatient clinics and dental suites, including HCAI-track projects with pressure relationships and seismic bracing.
Single shops through mall-wide refresh programs, working inside landlord engineering rules and night-work windows.
Stamped MEP drawings, equipment selections, and Title 24 docs in under three weeks from a basis of design.
Job flow in 3D
Same six stages on every Sierra job, from takeoff to the TAB report. Scroll to walk through it; drag to look around.
Budgetary number in 4 business hours. Itemized hard bid in 5 days.
DeliverablesBid · scope sheet · alternates
Clashes with structure and other trades are solved on screen, not in the field.
DeliverablesShop drawings · submittals · Title 24
CNC-cut, formed, and welded to SMACNA and NFPA 96. Never outsourced.
DeliverablesDuct · hoods · fittings
Leak-tested, tagged to the drawing, and delivered on your install date.
DeliverablesTest records · tagged pallets
Our own W-2 crews, with a PM in your OAC meetings every week.
DeliverablesRTU sets · rough-in · look-ahead
Start-up, NEBB/AABC test and balance, O&M manuals, and as-builts.
DeliverablesTAB report · O&M · as-builts
Next step - takeoff & budgetary pricing
Budgetary number in 4 business hours. Itemized hard bid in 5 business days. One PM from takeoff to closeout.